Public Participation Description of Environmental Impact Assessment for the Wei Hai CreditFan Ventilator Co., Ltd. New Energy Fan Production Expansion Project


 

 

 

 

 

 

Wei Hai CreditFan Ventilator Co., Ltd. New Energy Fan Production Expansion Project

Public Participation Statement on Environmental Impact Assessment

 

 

 

 

 

 

 

 

Wei Hai CreditFan Ventilator Co., Ltd.

January 2023 Weihai

 

1 Overview

Wei Hai CreditFan Ventilator Co., Ltd. New Energy Fan Production Expansion Project Located at Xing Shan Road, Chucun Town, Weihai Torch High-tech Industrial Development Zone 111 No. In accordance with the "Public Participation in Environmental Impact Assessment" and other regulations, relevant information is publicly disclosed in accordance with the law (information involving state secrets, trade secrets, and personal privacy shall not be disclosed in accordance with the law).

After the draft of the environmental impact report for the construction project is formed, it will be Wei Hai CreditFan Ventilator Co., Ltd. corporate website The draft for public comment will be released, and comments related to the environmental impact of the construction project will be solicited through the internet, newspapers, and posted announcements.

2 Initial Public Disclosure of Environmental Impact Assessment Information

The company on 2022 year 11 month 15 day after determining the report preparation unit, on 2022 year 11 month 17 day at Wei Hai CreditFan Ventilator Co., Ltd. corporate website conducted information disclosure (first announcement).

The disclosed information includes the basic project information, the name and contact information of the construction unit, the name of the environmental impact report preparation unit, the network link of the public opinion form, and the methods and channels for submitting the public opinion form, etc. This is in compliance with the "Public Participation in Environmental Impact Assessment".

The website address and screenshot are shown in Figure 1 as shown.

 

 

https://www.creditfan.com.cn/news/68.html

Figure Screenshot of the project's environmental impact assessment information disclosure (first announcement) website

3 Public Comment Draft Announcement

3.1 Announcement Content and Time Limit

After the preparation of the public comment draft is completed, information will be disclosed through the internet, newspapers, and posted announcements.

The public comment draft announcement includes the basic project information, methods and channels for obtaining the public comment draft, the scope of the public for soliciting opinions, the public opinion form, the methods and channels for the public to submit opinions, and the start and end times for submitting opinions, etc., in compliance with the "Public Participation in Environmental Impact Assessment". The start and end times are from the date of release 10 working days.

3.2 Announcement Methods

3.2.1 Newspaper

The announcement newspaper is selected from the mainstream media in Weihai " Weihai Daily" The announcement was published twice, on 2023 year 01 month 06 No., and 01 month 11 No., photos of the announcement are shown in Figure 2 as shown.

 

 

Figure Photos of the project's environmental impact assessment information disclosure in the newspaper

 

3.2.2 Internet

The online public platform selected is Wei Hai CreditFan Ventilator Co., Ltd. corporate website The website address and screenshot are shown in Figure 3 as shown.

 

https://www.creditfan.com.cn/news/70.html

Figure Screenshot of the project's environmental impact assessment information disclosure website (second announcement)

3.2.3 Posting

In accordance with the relevant provisions of the "Public Participation in Environmental Impact Assessment", the company posted announcements in the nearest villages (Si Jia Village, Yuan Xia Village) to the project location. Photos of the announcement are shown in Figure 4 as shown.

Figure Photos of the project's environmental impact assessment information disclosure postings

 

 

3.3 Review

At Wei Hai CreditFan Ventilator Co., Ltd. a site review point was set up, and no one came to review it on site.

3.4 Public Opinion

During the two announcement periods, no feedback was received from the public via telephone, email, written letters, or any other means regarding the environmental protection aspects of this project.

4 Other Public Participation

None.

5 Public Opinion Handling

During the two announcement periods, no feedback was received from the public via telephone, email, written letters, or any other means regarding the environmental protection aspects of this project. The surrounding surveyed public had no objections to the project construction.

 

 

7 Other

None

 

8 Commitment of Integrity

Our company has carried out public participation work in the preparation stage of the environmental impact report for the Wei Hai CreditFan Ventilator Co., Ltd. New Energy Fan Production Expansion Project in accordance with the "Measures". The reasonable opinions put forward by the public related to the environmental impact have been fully adopted in the environmental impact report. Opinions that were not adopted have been explained as required, and a public participation statement has been prepared as required.

Our company promises that the content of the "Public Participation Statement on Environmental Impact Assessment for the Wei Hai CreditFan Ventilator Co., Ltd. New Energy Fan Production Expansion Project" submitted this time is objective and true, and does not contain state secrets, trade secrets, or personal privacy that are not allowed to be disclosed by law. If there are any cases of falsification, concealment, or deception, and any consequences arising therefrom, Wei Hai CreditFan Ventilator Co., Ltd. will bear full responsibility.

 

 

 

 

 

 

 

 

Committing Unit (Seal or Signature): Wei Hai CreditFan Ventilator Co., Ltd.

Commitment Date: 2023 year 01 month 28 Day

 

 

9 Attachment

Wei Hai CreditFan Ventilator Co., Ltd. New Energy Fan Production Expansion Project

Environmental Impact Assessment Information Disclosure

Wei Hai CreditFan Ventilator Co., Ltd. plans to Xing Shan Road, Chucun Town, Weihai Torch High-tech Industrial Development Zone 111 No. expand the New Energy Fan production expansion project. According to the "Environmental Impact Assessment Law of the People's Republic of China" and the "Interim Measures for Public Participation in Environmental Impact Assessment" (Ministry of Ecology and Environment Ministry Order No. 4 According to the regulations (number), it is necessary to publicize the implementation of this project, so that the public can understand it, and also understand the public's attitude towards the construction of this project and their opinions and suggestions on environmental protection, and accept public supervision.

I. Project Overview

Project Name: New Energy Fan Production Expansion Project

Construction Unit: Wei Hai CreditFan Ventilator Co., Ltd

Construction Location: Xing Shan Road, Chucun Town, Weihai Torch High-tech Industrial Development Zone 111 No.

Project Nature: Expansion

Construction Scale: Project For Wei Hai CreditFan Ventilator Co., Ltd. construction New Energy Fan Production Expansion Project Construction location Located at Xing Shan Road, Chucun Town, Weihai Torch High-tech Industrial Development Zone 111 No. This Project Land area 44918m2 Construction The content mainly involves the expansion of wind turbine production. After the project is completed, it can increase the annual production of New Energy Fans 10 Ten thousand pieces /a The total production capacity of the enterprise will increase from 40 Ten thousand pieces /a To 50 Ten thousand pieces /a

II. Name and Contact Information of Project Contractor

Unit Name: Wei Hai CreditFan Ventilator Co., Ltd      

Contact Person: Manager Wang

Contact Number: 18863162719

III. Name of Environmental Impact Report Preparation Unit

Environmental Impact Report Preparation Unit: Shandong Huarui Environmental Protection Consulting Co., Ltd.

IV. Main Methods for Public to Submit Opinions

Public opinion form is attached.

Submit written opinions by phone, mail, fax, or email.

V. Methods and Channels for Submitting Public Opinion Forms

Contact Number: 18863162719

Email: xjl@creditfan.com.cn                       

Wei Hai CreditFan Ventilator Co., Ltd.

2022 year 11 month 16 Day

Wei Hai CreditFan Ventilator Co., Ltd. New Energy Fan Production Expansion Project

Public Consultation on Draft Information (Second Public Notice)

Wei Hai CreditFan Ventilator Co., Ltd. New Energy Fan production expansion project, located at Xing Shan Road, Chucun Town, Weihai Torch High-tech Industrial Development Zone 111 Number, The draft of the report is now complete and is open to public comment on the environmental impact of the project.

(I) Online link to the full text of the draft environmental impact report and methods and channels for reviewing the paper version of the report

Wei Hai CreditFan Ventilator Co., Ltd. New Energy Fan Production Expansion Project Environmental Impact Report》The draft of the report can be downloaded via Baidu Netdisk or viewed on-site at the construction unit.

(Link : https://pan.baidu.com/s/1h-XhCY-pnr3tIg1guL1qbg Extraction Code 'vt58' )

The paper version of the draft environmental impact report for this project is stored at the construction unit Wei Hai CreditFan Ventilator Co., Ltd. office. The public can go to the following address for consultation.

Contact Person: Manager Wang

Contact Number: 18863162719

Email: xjl@creditfan.com.cn

(II) Public Scope for Soliciting Opinions

Wei Hai CreditFan Ventilator Co., Ltd. Surrounding 3km Public within the scope.

(III) Online Link to Public Opinions

Public Opinion Form for Environmental Impact Assessment of Construction Projects

(Link 'https://pan.baidu.com/s/1Qt7LIRAipMg6D8B--dRYJA' Extraction Code '77wc' )

(IV) Methods and Channels for Public to Submit Opinions

The public can submit their opinions and suggestions related to the environmental impact of the project to the construction unit within the specified time through letters, telephone calls, emails, or by filling out the public opinion form at the construction unit.

(V) Start and End Time for Public to Submit Opinions

From the start of this announcement 10 working days.

                                  Wei Hai CreditFan Ventilator Co., Ltd.

2023 year 01 month

 

Attachment

Public Opinion Form for Environmental Impact Assessment of Construction Projects

Date of Completion     year     month     Day

Project Name

     Project

I. This page is for public opinions

Suggestions and opinions related to the environmental impact and environmental protection measures of this project Note: According to the "Public Participation in Environmental Impact Assessment" regulations, opinions or appeals related to Land acquisition and demolition, property, employment and other matters unrelated to the project's environmental impact assessment are not included in the public participation content of the project's environmental impact assessment.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(When filling in this item, please do not involve state secrets, trade secrets, personal privacy, etc. If this page is not enough, please attach another page.)

II. This page is for public information

(I) Please fill in the following information if the public is a citizen

Surname Given Name

 

ID Number

 

Valid Contact Information

(Telephone number or email address)

 

Usual Residential Address

Province    City   County (District, City)    Township (Town, Street) Village (Residential Committee)      Villager Group (Community)

Do you agree to disclose personal information?

(Fill in agree or disagree)

 

 

 

(If not filled in, it defaults to disagreeing to disclose)

(II) Please fill in the following information if the public is a legal person or other organization

Unit Name

 

Business Registration Number or Unified Social Credit Code

 

Valid Contact Information

(Telephone number or email address)

 

Address   Address

Province    City   County (District, City)    Township (Town, Street) Village (Residential Committee)      Villager Group (Community)

Note: Information on legal persons or other organizations can generally be made public. If there is information that cannot be disclosed, please specify the legal basis and the specific information that cannot be disclosed in this column.

     

 

Related news


Public Notice on the Completion of Environmental Protection Facilities for Weihai CREDIT Group Co., Ltd.'s Industrial Thermal Management Equipment Manufacturing Project

According to Article 11(1) of the Announcement on the Issuance of the Provisional Measures for the Acceptance of Environmental Protection upon Completion of Construction Projects (Guohuan Guihuanping [2017] No. 4), "Environmental protection facilities supporting the construction project shall be completed after the completion of the construction project


2023 Annual Report on Hazardous Waste Declaration

2023 Annual Report on Hazardous Waste Declaration


CREDIT wins two prestigious Golden Bull Awards from a publicly listed company

On November 23, the "Advanced Manufacturing and New Productivity - 2023 China Listed Companies High-Quality Development Forum and the 25th Golden Bull Award Ceremony for Listed Companies," hosted by the China Securities Journal, was successfully held.